The Aquarius 1 has a towered sunspace, and in this configuration there is access to the sunspace from the 2nd floor master bedroom suite. This Connecticut home will produce electric power and be self-sustaining in terms of hot water, heating and cooling.
Mark and Amy are siting their home and have decided exactly where they want it to be.
Stacks Image 5699
Stacks Image 5703
Stacks Image 5706
Stacks Image 5710
Stacks Image 5713
Amy and Mark are putting up an array of photovoltaic (PV) panels FIRST so that they can start providing power from the Sun during the construction process. Here the structure that points the panels in the right direction at the right angle is being sited.
Stacks Image 5719
Stacks Image 5722
Once the structure is complete and the panels installed, work on the house foundation begins. Mark and Bob are relishing their progress.
Stacks Image 5728
Stacks Image 5731
After excavation, forms for the footers are built and poured with concrete.
Stacks Image 5737
Stacks Image 5740
Forms for the foundation walls are built and poured. Solid concrete walls are required to support the massive heavy timber Enertia® kit walls.
Stacks Image 5746
Stacks Image 5748
Support posts are installed as per the Enertia® blueprint.
Stacks Image 5753
After the walls are poured, they are waterproofed, insulated, and the framework for the main level subfloor is constructed.
Stacks Image 5757
Stacks Image 5761
Stacks Image 5764
It's time to open the first bundles of Enertia® Green Building Block™ timbers.
Stacks Image 5770
Stacks Image 5772
Stacks Image 5775
This customized Aquarius 1 home has an optional heavy timber lower level component which is the first part of the Enertia® kit to be erected. The large window openings are on the South side.
Stacks Image 5779
Stacks Image 5783
Stacks Image 5785
Stacks Image 5788
Stacks Image 5790
The subfloor is complete and the first row of timbers is being set. The tall verticals are buttresses that block the double north wall at the door opening. You can also see the door frame in the outer north wall. Mark and Tim are discussing the plans. Tim Sund (Sund Energy Homes) is the Enertia® builder/dealer and the builder for this project.
Stacks Image 5796
Stacks Image 5799

Everyone has work to do!

Stacks Image 5805
Stacks Image 5807
Stacks Image 5810
Stacks Image 5812
As the house goes up, row by row, door and window frames are added and braced. They form anchor points to keep the walls straight and true.
Stacks Image 5820
Stacks Image 5823
Stacks Image 5828
Stacks Image 5831
Outlet boxes are mortised into the timbers in the factory, but there is still some drilling to be done on-site.
Stacks Image 5837
Stacks Image 5839
Stacks Image 5842
Stacks Image 5844
An attached heavy timber garage (an option from Enertia®) is included in this kit. As per the building code, the garage floor is at a lower level than the main house floor. The garage and house are erected in tandem.
Stacks Image 5850
Stacks Image 5852
Stacks Image 5855
Stacks Image 5857
At this point, the timbers are about to "cross over" the first floor windows and doors. The finished appearance of the home is starting to become evident. Amy spends as much time at the site as possible to see the house take shape.
Stacks Image 5863
Stacks Image 5865
Stacks Image 5868
Stacks Image 5870
The girders that support the upper level floor system are in place.
Stacks Image 5876
Stacks Image 5878
Stacks Image 5881
Stacks Image 5883

Floorbeams are set to support the upstairs flooring.

Stacks Image 5889
Stacks Image 5892
A temporary plywood subfloor is put down above the floor beams and will stay in place as a working surface until the house is dried in.
Stacks Image 5898
Stacks Image 5900
The double North wall with its 8" air space is going up on the second floor. There will be a bathroom in the section where the wall is not doubled.
Stacks Image 5905
Stacks Image 5907
Stacks Image 5911
Stacks Image 5914

The sunspace tower is rising on the South.

Stacks Image 5920
Stacks Image 5923

The East gable is rising. The exterior corners will be capped towards the end of the building process.

Stacks Image 5929
Stacks Image 5932
The West gable is also rising. The bracing of the gable walls is very important in strengthening those walls until they are completed and the connecting ridge beam and rafters are in place.
Stacks Image 5938
Stacks Image 5941

Enertia® homes are solid timber right up to the peak of the gable, which is only about 3 timbers away.

Stacks Image 5947
Stacks Image 5950
The East (left) and West gables are completed. Note the extensive temporary bracing.
Stacks Image 5956
Stacks Image 5959
The house wall timbers are all in place. All that is remaining for completing the kit (the structure of the home) is to set the ridge and rafters and finish the garage walls.
Stacks Image 5965
Stacks Image 5968
Hurricane Irene blew through just after the peaks topped out, and before the ridge and rafters were set. Good temporary bracing and the integrity of the structure stood up to the storm.
Stacks Image 5974
After the storm passes, the heavy timber ridge is set (using a crane) and the gables are stabilized.
Stacks Image 5981
Stacks Image 5984
Each rafter is picked up by the crane and lifted into position. The crew and the crane operator are in constant communication. This is best accomplished on a windless day.
Stacks Image 5990
Stacks Image 5992
Stacks Image 5994
Stacks Image 5996
Stacks Image 5998
Having a crane on-site to set these giant timbers is also appreciated.
Stacks Image 6003
The bottom angle is precut on each rafter. On site the crew measures for and cuts the top angle.
Stacks Image 6007
Stacks Image 6009
At this stage, the roof structure is so beautiful that it seems a shame to have to cover it. But, the next time it rains getting dried in will be appreciated.
Stacks Image 6013
Stacks Image 6015
Stacks Image 6019
Stacks Image 6022
The rafters are and the heavy timbers for the South Tower all set. The Enertia® kit is complete except for the completion of the garage walls. The next big step on the house is to set the SIPS roof panels.
Stacks Image 6028
Stacks Image 6031

The garage walls are going up. The roof of the garage will be constructed with pre-built trusses.

Stacks Image 6037
Stacks Image 6040

There are pockets pre-cut in the timbers to facilitate the building of a porch across the North side of the house.

Inside, temporary stairs have been built to allow easy access to the upper level.
Stacks Image 6049
Stacks Image 6053
Stacks Image 6056
The SIPS (Structural Insulated Panels) have arrived via flatbed truck and are being using by a rented crane. They add strength, warmth and support for the finished roofing material.
Stacks Image 6062
Stacks Image 6065
The Enertia team visited soon after the panels were set and covered with roofing felt. Setting the windows is the last step to a "dried-in" building.
Stacks Image 6071
Stacks Image 6074

Views of the Sunspace - looking up at the tower and inside.

Stacks Image 8850
All the windows are installed. The house is "dried in" and the house will now begin to heat and cool itself. Working on the inside will become more comfortable as thermal intertia builds up and starts to work.
Stacks Image 11
A deck wraps around the West and North sides of the house
Stacks Image 16
Stacks Image 18
Stacks Image 6080
The Photovoltaic panels are up and running. To date 459 kWh (kilowatt hours) have been produced. This power is "grid-tied," so the home will connect to the grid for power, but will get a check back from the power company for the solar power produced here.
Stacks Image 6085
Stacks Image 6087
Stacks Image 9492
Progress is also being made inside. Some of the kitchen cabinets and appliances have been delivered and/or installed.
Stacks Image 9522
Stacks Image 9527

A beautiful slate patio is under construction outside of the walkout South basement.

Stacks Image 6091
Many thanks to Amy and Mark and to Tim Sund at Sund Energy Homes for sharing these photos with us. We will post more as we receive them, and we look forward to touring the finished home.